Construction of the ABO Ribbok Wind Energy Facility 4 and the associated infrastructure, located on the Remaining Extent of the Farm Vogel Valley No. 34, the Remaining Extent of the Farm Waai Kraal No. 101, Portion 1 of the Farm Waai Kraal No. 101, the Remaining Extent of the Farm Amoy No. 105, Portion 2 of the Farm Grootfontein Landgoed No. 33, the Remaining Extent of the Farm Roode Kop No. 34. near Hanover and Richmond, Northern Cape. The scope of works includes: Wind turbines (number and maximum development specifications to be confirmed), on-site facility substation hub, battery energy storage system, temporary and permanent laydown areas, internal and external/main access roads, internal reticulation network, operation and maintenance buildings. The exact GPS co-ordinates are 31°14'47.7"S 24°15'33.3"E.
Project at a glance
ABO Ribbok WEF 4 is located in Richmond (NC). The project is classified in the Private sector. Its current recorded stage is Postponed.