Project overview
About this development
Development of a logistic sequencing facility for Daimler Truck Southern Africa within the East London Industrial Development Zone, West Bank, East London, Buffalo City Metropolitan Municipality, Eastern Cape. Value of the project: R216 508 800.00 Extent of the Works: Factory - single storey steel framed factory building, approximately 16 000m² with a free inside height of approximately 8m. The factory also includes covered docking areas and covered side loading areas. Office Block - Double storey office building, approximately 490m² with the ground floor comprising of a lobby, reception area, green room, male and female change room/ablutions, driver’s ablutions and employee clock card area. The first floor comprises of an open plan office area, offices, kitchenette, boardroom, male and female ablutions and terrace area. Receiving Office Area - Single storey office building, approximately 70m² which comprises of an open plan office, driver’s ablutions, male and female ablutions and duct area. Other Facilities include a fire booster pumpstation and two water reservoirs, covered refuse and bin-wash facilities, guardhouse and entrance canopy. The works also cover installations such as fire detection, fire protection, HVAC, access control as well as associated electrical services. General civil works encompass water, sewer, stormwater, subsoil installations, installation of ducting, earth and layerworks, construction of concrete hardstand, block-paved sidewalks and parking areas, reinforced concrete and / or block retaining walls, perimeter fencing and landscaping. The GPS co-ordinates of the site are 33°3′31.92"S; 27°50′40.34"E
Project at a glance
Daimler Logistic Sequencing Facility is located in KuGompo City (East London). The project is classified in the Private sector. Its current recorded stage is Underway. The recorded project value is R 200 Million+.