Project overview
About this development
Construction of the Amangwe waterworks, rising main, and high lift pumps, located in Emoyeni, KwaZulu-Natal. Value of R34 692 297.87. The scope of work could consist of: 2.1km of steel bulk water rising mains and associated pipeline infrastructure, 800m of uPVC interlinking pipelines, re-routing and remedial measures for approximately 200m of 250mm dia existing steel pipeline, civil and structural works for the package plant, supply and install a floating roof for the existing top pond, remedial works to the concrete panel joints in existing ponds, gravel access roads and associated stormwater drainage, electrical and mechanical works for the high lift pump station (1 set of duty/standby pumps) and a 1,8Ml/day package water treatment works, electrical ducting and cabling and security fencing. The GPS marker has been placed at the site 28°56'34.8"S 29°34'55.3"E
Project at a glance
Amangwe Waterworks High Lift Pumps is located in Winterton. The project is classified in the Public sector. Its current recorded stage is Underway. The recorded project value is R 31 Million - R 60 Million.