Project overview
About this development
Construction of Phola Mshishi Roads, Phase 2 in Khethani Township approximately 24km from Bergville, Ward 01 of Okhahlamba Local Municipality, KwaZulu-Natal. Project value: R16 949 655.86. Scope of works entails the construction of 1.607 km asphalt finish roads broken down as follows: Construction of Road 1 with a length of 352m and a width of 7m; Road 2 with a length of 685m and a width of 7m; Road 3 with a length of 570m and a width of 7m; provision of storm water pipe crossings 600mm diameter pipes, 300mm wide v storm-water channel on the LHS and RHS, and manholes used to discharge run off; provision of catch pits and headwalls at cross-drainage points; provision of pipe culverts at new designed positions and provision of road signs. The GPS of the 3 roads are as follows: Phola Mshishi Road 1 Start 28°48'40.03"S; 29°31'45.12"E End 28°48'47.75"S; 29°31'25.79"E; Road 2 Start 28°48'40.28"S; 29°31'39.48"E End 28°48'54.75"S 29°31'34.53"E and Road 3 Start 28°48'33.35"S; 29°31'51.11"E End 28°48'39.64"S; 29°31'45.57"E. The marker has been placed at the start of Road 1 28°48'40.0"S 29°31'45.1"E
Project at a glance
Khethani Township Roads Phase 2 is located in Winterton. The project is classified in the Public sector. Its current recorded stage is L2B Shelved. The recorded project value is R 0 Million - R 30 Million.