Project overview
About this development
Construction of an up to 150MW photovoltaic solar facility and associated infrastructure on the Remaining Extent farm Christina No. 1037 and the Remaining Extent of Farm Dina No. 1039, Maluti-a-Phofong Local Municipality, Harrismith, Free State. The town of Harrismith is located approximately 13km east of the proposed development. The total footprint of the project will approximately be 300 hectares (including supporting infrastructure on site) within the assessed 413ha EIA footprint. The property on which the facility is to be constructed will be leased by Table Mountain Solar Power Plant (RF) (Pty) Ltd from the property owner, for the lifespan of the project (minimum of 20 years). The approximate GPS co-ordinates are 28°13'32.2"S 28°57'34.0"E
Project at a glance
Table Mountain Solar Power Plant is located in iNtabazwe (Harrismith). The project is classified in the Private sector. Its current recorded stage is Postponed. The recorded project value is R 200 Million+.