Project overview
About this development
Construction of the Anzani Hydrogen Power Plant and associated infrastructure, on the Remainder of Farm Dwars in die Weg 350-IS, in the vicinity of Eskom’s Tutuka Coal Power Station, approximately 13km north-east of the village of Thuthukani, Mpumalanga. The power plant will comprise the following infrastructure: Photovoltaic Plant: PV modules; inverters and transformers; low voltage cabling between the PV modules to the inverters; onsite facility substation; battery energy storage system (BESS); site offices and maintenance buildings; access roads and internal distribution roads (up to 10m). Hydrogen Components: Electrolysis system; H2 storage tanks; fuel cell system. Other main process equipment: Air compressor unit; H2 compressor unit; water treatment unit; electrical room. Water treatment plant. Grid connection components. The exact GPS co-ordinates are 26°44'52.1"S 29°25'54.1"E.
Project at a glance
Anzani Hydrogen Power Plant is located in Morgenzon. The project is classified in the Private sector. Its current recorded stage is Procedural.